Zeichenfläche 1binoculars Zeichenfläche 1_bog Zeichenfläche 1book Zeichenfläche 1_camera Zeichenfläche 1_chart Zeichenfläche 1_compass Zeichenfläche 1_daylight Zeichenfläche 1_dokumentation Zeichenfläche 1_dokuments Zeichenfläche 1_fish Zeichenfläche 1_flyer Zeichenfläche 1_forest Zeichenfläche 1_frog Zeichenfläche 1_heron Zeichenfläche 1_hourglass Zeichenfläche 1_map Zeichenfläche 1_meeting Zeichenfläche 1_ruler Zeichenfläche 1_shovel Zeichenfläche 1_speedometer Zeichenfläche 1_swamp Zeichenfläche 1_temperature Zeichenfläche 1_timeline Zeichenfläche 1_timer Zeichenfläche 1_water Zeichenfläche 1_wave

Groundwater monitoring established in the Latvian project sites

In Latvia, within the LIFE Peat Restore project, blocking of ditches is proposed in three areas. In all these sites, prior to restoration actions careful surveys and hydrological and hydrogeological modelling was done. It means that a hydrogeologist has assessed the current situation and potential impacts of ditch blocking. As the next step, the appropriate locations for dams on ditches were selected. The dams are planned by bearing in mind that they have to fultil their task – to rewett the drained peatlands, without causing damage to the adjacent forests, agricultural lands and homesteads. The results of hydrological and hydrogeological studies and modelling was presented in several meetings to representatives of the official steerings groups and people from local communities.

In Lake Engure Nature Park, large amount of water is being drained through this ditch in springtime. Blocking of two ditches is proposed to decrease the amount of water which is lost in this way. Groundwater monitoring wells are established nearby the proposed dams. Photo: O. Aleksāns.

 

 

 

 

 

 

 

 

 

 

To be sure on the actual impacts, the project areas will be monitored throughout the project lifetime – before and after blocking the ditches. To evaluate the situation before restoration, we have already started the monitoring. This will allow understanding the pre-restoration condition and analysing the changes induced by the restoration works.

In April 2018, we have established groundwater monitoring wells in all project sites in Latvia (Baltezers Mire, Madiešēnu Mire, Lake Engure). The groundwater table is being monitored automatically by loggers, which provide regular (once per hour) and frequent measurements with high accuracy. Four times per year the data will be summarized and analysed by our project expert. We continue working and collecting the data which will be necessary to carry out the restoration.

An example of the first groundwater monitoring results in Lake Engure project site in Latvia covering the time period from April to June 2018.