Zeichenfläche 1binocularsZeichenfläche 1_bogZeichenfläche 1bookZeichenfläche 1_cameraZeichenfläche 1_chartZeichenfläche 1_compassZeichenfläche 1_daylightZeichenfläche 1_dokumentationZeichenfläche 1_dokumentsZeichenfläche 1_fishZeichenfläche 1_flyerZeichenfläche 1_forestZeichenfläche 1_frogZeichenfläche 1_heronZeichenfläche 1_hourglassZeichenfläche 1_mapZeichenfläche 1_meetingZeichenfläche 1_rulerZeichenfläche 1_shovelZeichenfläche 1_speedometerZeichenfläche 1_swampZeichenfläche 1_temperatureZeichenfläche 1_timelineZeichenfläche 1_timerZeichenfläche 1_waterZeichenfläche 1_wave

First results of peatland restoration in Latvia are promising

To stabilize water level and restore environment for mire vegetation development, dam building was completed in November 2020 in all three Latvian project sites. Within the framework of LIFE Peat Restore project, 36 dams were built. As a result peatland hydrology will be stabilized in the total area of 274.4 ha in three mires – Madiešēnu Mire in Augstroze Nature Reserve, Baltezers Mire and fens in Engure Lake Nature Park. Positive tendencies in water level rise in drainage ditches and peat top layer moistening were observed already after few months after dam building in Madiešēnu Mire and Baltezers Mire.

To follow the restoration success, so far only water level monitoring data were analysed. For this reason monitoring wells with automatic data loggers were installed in each project site already in April 2018. Vegetation monitoring will proceed in spring 2021 as soon as active plant growth season begins.

Water level monitoring using automatic data loggers. Photo: M. Pakalne.
Water level monitoring using automatic data loggers. Photo: M. Pakalne.

Northern part of Madiešēnu Mire was drained in time period from 1983 to 1998. To restore the degraded area around ditches in total area of 147.8 ha, 26 peat dams were built. Water level monitoring is carried out in nine wells that are located in three transects with different distance from ditches. Drainage in Baltezers Mire Nature Reserve was processed more than 100 years ago. To prevent a further degradation of mire habitat, eight peat dams were built. Modelled hydrology stabilization area reaches to 40.5 ha. Nine water level monitoring wells are used to follow the success of restoration. Calcareous fens in Engure Lake Nature Park have developed in previous lake area after water lowering and are gradually overgrowing with shrubs. Two plastic dams were installed to restore the fens in total area of 86.1 ha. Water level monitoring is carried out in eleven wells.

Location of peat dams, monitoring wells and plots in Madiešēnu Mire (top), Baltezers Mire (middle) and Engure Lake Nature Park (bottom). Modelled hydrology stabilization area is also marked.

Before dam building, significant water level table fluctuations were observed in wells, in some even by more than 1 m, especially in those located near drainage ditches, e.g. No.5 in Madiešēnu Mire and No.4 in Baltezers Mire. After restoration, fluctuations are still recorded, yet they are shallower than before. A rise of water level in some wells (in Madiešēnu Mire – by 25 cm in one and by 11-15 cm in three others wells, in Baltezers Mire – by on average 2-6 cm) shows positive tendencies of peat layer to gradually getting moister.

Water table level curves from monitoring wells in Madiešēnu Mire (top), Baltezers Mire (middle) and Engure Lake Nature Park (bottom). Time of restoration work is marked as a grey box.

Rapid water table changes are not expected in the restoration area, as there was a relatively high water level in the sites already before. Aim of the peatland restoration is to favour moistening of the top peat layer in the degraded area and avoid creating of open-flooded places. For carbon accumulation, plant photosynthesis and peat formation processes, stable water level is the most important factor, instead of the relative depth of water table. Therefore, after blocking of active drainage ditches and preventing from the water run-off, the natural processes of mires re-establish, plant species return and start to spread again in the degraded area.

Water level in ditches in Madiešēnu Mire two months after dam building. Photo: M. Pakalne.
Water level in ditches in Madiešēnu Mire two months after dam building. Photo: M. Pakalne.
Water level in ditches in Baltezers Mire four months after dam building. Photo: K. Libauers.
Water level in ditches in Baltezers Mire four months after dam building. Photo: K. Libauers.

Analysing of restoration success in Engure site is still in process as the area was visited only once, a month after dam building. This time period in this site at the margin of the fen and surrounded by pine forest is insufficient for water level to react to restoration activity on ditches.  

Monitoring will be proceeded in the active vegetation season. Photo: M. Pakalne.